Workpiece tray conveyor line, new energy conveyor line, lithium battery conveyor line, double speed chain conveyor line, double speed chain assembly line, synchronous belt conveyor line, toothed belt conveyor line, belt conveyor line, drum conveyor line, tray drum conveyor line, power drum conveyor line
The installation of the workpiece tray conveyor line requires special attention to the support system, grounding protection, conveyor line debugging, and positioning accuracy. Specific precautions are as follows:
1、 Specification for bracket installation
Horizontal support spacing: It is advisable to control within the range of 1.5-3 meters to ensure even support.
Vertical bracket spacing: should not exceed 2 meters, and anti sway brackets (round steel suspension rod diameter ≥ 8mm) should be added.
Branch/end fixation: A fixed bracket must be installed at a position of 0.3-0.5 meters at the branch or end.
2、 Grounding protection requirements
Number of grounding nodes:
When the total length is ≤ 30 meters, at least 2 grounding connections should be made;
When the total length is ≥ 30 meters, a grounding point must be added every 20-30 meters, and both ends must be grounded.
Cross connection method:
Non galvanized trays/troughs need to be cross connected to protect the connecting conductor (anti-corrosion coating affects conductivity);
Galvanized components can be fastened by connecting plates (with ≥ 2 anti loosening bolts or nuts at each end).
Workpiece tray conveyor line, new energy conveyor line, lithium battery conveyor line, double speed chain conveyor line, double speed chain assembly line, synchronous belt conveyor line, toothed belt conveyor line, belt conveyor line, drum conveyor line, tray drum conveyor line, power drum conveyor line
3、 Conveyor line debugging and maintenance
Inspection of transmission components:
The tension of the chain/belt needs to be tested to avoid looseness or deviation;
Motor operation status monitoring (noise, vibration, temperature rise).
Track and sensors:
The track surface should be kept flat and free of debris accumulation;
The sensitivity and accuracy of the position/weight sensor need to be calibrated.
Joint and lubrication: Verification of the firmness of the conveyor belt joint, and regular lubrication of key moving parts.
4、 Positioning and Security Control
Accuracy guarantee: The gear stop and lifting locator ensure that the positioning error of the tray is ≤± 0.5mm.
Modular adaptation: The turning module and lifting unit need to be matched with the production line layout to avoid collision risks.
Overload protection: Select the conveying medium according to the load requirements (the double speed chain can bear up to 4 tons, and the synchronous belt is suitable for light load scenarios).